BOILERS AT REST

WD190 today had the boiler put back in place, next step is getting the tank back on and steam testing.  Good to see it going back together.

When I asked what was needed to get her back steaming it was made to sound very easy - good job I know otherwise!
Once the lorry had finished with WD190, the boiler was lifted from RSH 0-6-0ST Jupiter.  This 1950 built loco will be the next project when WD190 is finished.

Comments

Popular posts from this blog

KENNETT SIGNAL BOX ARRIVES

MODEL RAILWAY EXHIBITION

THOMAS THE TANK ENGINE