DIESEL CRANE OPERATIONS

11th July saw the diesel crane operate for the first time in several years.  This has gradually been got back to working condition by a couple of our volunteers.

It successfully lifted the cab roof and tank off WD200.
Work is continuing on this loco, and the wheels from Jupiter have gone away to be turned

Comments

Popular posts from this blog

KENNETT SIGNAL BOX ARRIVES

THOMAS THE TANK ENGINE

WD190 BACK IN ACTION