MODEL RAILWAY SHED


The main frame of the new shed for the model railway is really taking shape now.
A new wood burning stove has been installed in Nunnery signal box, so we will now have all the signalmen volunteering to work that box in the winter!!

Comments

Popular posts from this blog

KENNETT SIGNAL BOX ARRIVES

THOMAS THE TANK ENGINE

WD190 BACK IN ACTION